WCTC 2.2.5: Updating Content
This concise summary outlines the process of updating content in WorkLink Create, specifically focusing on the replacement of a project asset with a new or optimized version. You will learn the following;
-
Introduction to Updating Content:
- Explanation of the scenario: The need to update content after optimization and authoring stages.
-
Identifying the Asset:
- Reference to the Asset Library, specifically using the example of the "battery box opt2" asset in the project.
-
Replacing Project Asset:
- Introduction of the "replace project asset" feature in WorkLink Create.
- Right-clicking on a specific asset in the library (e.g., "opt2") provides an option to replace the asset.
-
Selecting a New Model:
- Prompt to select a new model to replace the existing one.
- Options include choosing a previous revision or any other suitable model.
-
Component Remapping:
- Explanation of the system's capability to remap components from the old asset to the new one.
- Visual representation of the remapping process in the user interface.
-
Confirmation and Implementation:
- User action required to confirm the replacement of the project asset with the selected new model.
- Assurance that the replacement will apply to every instance of the specified asset in the project.
-
Use Cases for Updating:
- Broadening the scope of updating, including scenarios like introducing a new optimization or adding an updated version to the asset library.
-
Conclusion:
- Highlighting the user-friendly mechanism in WorkLink Create to seamlessly update a project with a new version of the asset.