WCTC 0.3.1: Introducing the four stages of Project Creation
The video introduces the authoring process in Scope AR's WorkLink Create training, focusing on the four stages: Project Planning, Content Preparation, Authoring, and Publishing/Distribution.
-
Overview of the Four Stages:
- The four stages are Project Planning, Content Preparation, Authoring, and Publishing/Distribution.
- Visualization shows where each stage takes place, emphasizing the importance of following the green line through the stages.
-
Importance of Project Planning:
- Project Planning is crucial and should not be skipped.
- It involves discovering and planning the project idea, answering questions about the project's goals, audience, and expected outcomes.
-
Connection Between Project Planning and Content Preparation:
- Project Planning leads to Content Preparation, where 3D and 2D assets are collected and prepared for use in the AR instruction.
-
Authoring and Common Pitfalls:
- Authoring is the stage where the project plan is executed in WorkLink Create.
- Starting at Step 3 (Authoring) without proper Project Planning can lead to issues, represented by the red line in the visualization.
-
Content Preparation Phase:
- Content Preparation is a challenging step requiring knowledge of 3D content and a strong project plan.
- It involves preparing instructional, 2D, and 3D content, with a focus on optimization for effective AR experiences.
-
Types of Content in Content Preparation:
- Instructional content includes text, videos, and insights from end-users.
- 2D assets like diagrams and photos are prepared, and 3D content is acquired and optimized for AR.
-
Supported CAD File Types:
- A list of supported CAD file types for the cloud implementation is provided.
-
Project Map and Clear Plan:
- Project Planning results in a project map, providing a clear plan for Content Preparation and Authoring.
- A clear plan is essential for effective Content Preparation, especially for optimizing assets.
-
Easy Authoring with Effective Project Planning:
- With a well-executed Project Plan and prepared assets, Authoring becomes a smoother process.
-
Publishing and Distribution:
- Publishing and Distribution is the final phase, involving hitting publish, generating a scenario, and distributing it to end-users via the WorkLink app.
- Choices include data collection levels and encryption for scenarios.
-
WorkLink CMS:
- The WorkLink CMS (Content Management System) is introduced for managing users, licenses, and groups for targeted distribution.
-
Conclusion and Key Takeaways:
- The four stages serve as the thesis for the training.
- Emphasis on not skipping Project Planning, as it is vital for effective AR instruction creation.
- Looking forward to diving deeper into specific stages, starting with Project Planning.